In Episode 3 of Data Center Deep Dive, a series from The Kansas City Market Pulse, Logan Freeman and Mitch Case explore whether an existing warehouse or industrial building can be converted into a data center, and the real estate, infrastructure, and feasibility considerations behind industrial-to-data-center conversions.
Not every warehouse or industrial facility is a viable candidate. Power availability, cooling requirements, structural limitations, connectivity, and development timelines can determine whether a conversion makes sense, or whether starting from scratch is the better option.
Episode Highlights:
Now streaming on YouTube, Spotify, Apple Podcasts, and all major platforms. Subscribe so you never miss an episode of The Kansas City Market Pulse.
Can you convert a warehouse into a data center?
In Data Center Deep Dive Episode 3, Logan Freeman and Mitch Case of Midwest CRE Advisors explore that question. Not every warehouse or industrial facility is a viable candidate. Power availability, cooling requirements, structural limitations, connectivity, and development timelines can determine whether a conversion makes sense, or whether starting from scratch is the better option.
What feasibility factors matter in an industrial-to-data-center conversion?
The episode covers industrial conversion opportunities, power and infrastructure (electrical capacity, utility availability, and delivery timelines), cooling and mechanical systems for high-density computing and AI workloads, building feasibility (structural requirements, floor loads, ceiling heights, and existing systems), speed to market versus ground-up construction, and real estate strategy for owners, developers, and investors.
What is Data Center Deep Dive?
Data Center Deep Dive is a five-part series from The Kansas City Market Pulse, presented by Midwest CRE Advisors and hosted by Logan Freeman and Mitch Case. It explores the intersection of commercial real estate, data center infrastructure, and demand for AI and compute capacity.
Where can I listen to "Can You Convert a Warehouse Into a Data Center? | Deep Dive Ep. 3"?
"Can You Convert a Warehouse Into a Data Center? | Deep Dive Ep. 3" from The Kansas City Market Pulse, hosted by Logan Freeman of Midwest CRE Advisors, is on Spotify, Apple Podcasts and YouTube, and on the show page at mwcreadvisors.com.
Why does outdoor space matter when converting an industrial building into a data center?
Mitch explains that cooling equipment can require substantial space outside the building or sufficient structural support on the roof. Logan also highlights yard access for backup generation and equipment logistics. A building with limited outdoor space may face constraints even if its interior appears suitable for conversion.
When might demolition and rebuilding make more sense than retrofitting?
Logan identifies situations where foundation repairs, roof reinforcement, or slab upgrades could make reuse uneconomical. He also discusses incompatible column spacing, limited clear height, and building footprints that restrict the intended layout. In those cases, a purpose-built facility may offer a better solution, but the decision requires comparing the costs and capacity of both approaches.
Why is environmental due diligence important for an industrial conversion?
Logan explains that an industrial property’s operating history can reveal environmental issues that affect both cost and schedule. The episode discusses Phase I environmental site assessments and potential follow-up investigation, including concerns involving underground storage tanks, solvents, heavy metals, and PCBs. Remediation or ongoing monitoring can change whether a conversion remains practical.
What is the difference between speculative, entitled, and live megawatts in the episode’s valuation framework?
Logan uses three categories to describe power readiness: speculative power without a utility commitment, entitled power supported by signed interconnection agreements, and live power that is already flowing. He explains that reducing uncertainty around power delivery can strengthen a property’s positioning and help determine whether selling, pursuing a joint venture, or holding the asset makes sense.
Can reusing an existing building shorten a data center development timeline?
Logan says the right powered shell and building structure can potentially reduce the schedule by 12 months or more compared with a ground-up project. He emphasizes that this advantage depends on resolving structural, utility, cooling, and permitting issues early. Mitch cautions against assuming that an indication of available power means a project can be delivered within a few months.